Firstly I would like to thank everyone who has taken the time and effort to respond to our survey and a special thanks for the support received from the Rixton with Glazebrook Parish Council along with local Councillors Rob Tynan and Lawrence Sheridan.
Below you'll find copies of the relevant emails that I've received in relation to the numerous emails and communications that I've had with various authorities
I've dated all the messages but removed threaded duplicates and acknowledgments etc and tried to keep all messages in a chronological order.
My emails are coloured green, responses are blue and messages containing something of importance, red.
Please click in the top right hand corner if yo want to access the email addresses of correspondents.
Contents
Good Morning,
I'm hoping that you'll be able to help with the ongoing problem that we have with speeding traffic on Glazebrook Lane. Once again we have had our property damaged by an out of control car. This is the 5th time in 10 years that we have experienced damage to our property and the 8th time in that period that there have been reported incidents with police involvement.
How there has not yet been a serious injury or worse, a fatality is remarkable.
All but one of the 8 incidents have involved cars travelling from Hollins Green direction to Culcheth and do not include the vehicles that we regularly see sailing past and out of control whilst not actually hitting anything.
Every driver involved in the incidents has been a young male under 25 and incredibly, the maximum speed that they've admitted to is 33mph! A figure that I find hard to believe when they have lost control on the railway bridge and travelled a further 50 yards before causing substantial damage and from all appearances writing off their cars.
Having to endure consistent speeding cars past the house, abuse when suggesting that drivers slow down and constant fear every time we leave our own property to walk the dogs - or even pull off the drive in the car - leaves both of us, but especially my wife in a state of great anxiety and upset.
Previously we've had the hedge and garden replanted and reported the incidents but now, one lamp post, the road sign and two telephone poles later, enough is enough. We really need something done about the speed and total disregard that many drivers seem to have for what is essentially the residential area of Glazebrook.
I would welcome a meeting or conversation with you about the possible ways forward.
I must also say that I know that we have the support of all of the residents of Glazebrook Lane when we've canvassed them about this.
The above is only a reflection of our experience and doesn't include significant damage to other properties and property of our neighbours as a result of these crashes.
I look forward to hearing from you.
Kind Regards
Tony Whittingham
144, Glazebrook lane
Glazebrook
Warrington
WA3 5AZ
13th April
Hi Tony
Thanks for your email. Apologies, I'm not sure what happened to your voicemail.
Unfortunately whenever I've raised this issue before I'm told its down to the police but I will speak to them pass on your concerns.
Also if you could pass onto me the details of the canvassing you carried out ie names and addresses I could speak with WBC officers about the situation to see if there is a way to reduce the danger.
Kind regards
Rob
Thanks Rob,
The canvassing is currently ongoing as the last incident ( the one that has broken the camel's back) only happened on Saturday morning and I've only just put it together. I collared Councillor Sheridan (who was very supportive) this morning at the surgery in Hollins Green and I've also sent a copy of the email to Charlotte Nichols. We're intending to attend the parish council meeting this Wednesday but any pressure that can help resolve the situation is much appreciated.
As we've pointed out on many occasions a serious accident or fatality due to speed on Glazebrook lane is definitely a 'when' and not 'if' situation.
Many thanks
Tony
16th April 2026
Afternoon Tony,
I have sent in s full report to the council officers and copied in the leader of the Council Cllr Hans Mundry, as a matter of urgency,
I will update you to any response.
Kind Regards
Lawrence
Thanks Lawrence,
For your information I've also contacted the commissioner for Cheshire police, and asked for reports of police attended incidents along with requests for action re speeding to WBC and Cheshire constabulary for the last 10 years via a freedom of information request.
We've had an overwhelming response to our survey already with many respondents citing similar experiences to ourselves along with a general dissatisfaction with previous responses from the council.
The main message from almost 100% of respondents is feeling unsafe due to the speed of traffic along with the attitude of drivers passing through the village.
We hope that we can continue to move forward with this with your support
Tony
Thank you for your email. This acknowledgement has been triggered automatically and I have not yet had a chance to read your message.
I try to reply to emails as quickly as possible but please note I receive a large number of emails, letters and phone calls every day, so I would ask for your understanding if you do not receive an immediate reply.
E-mails are treated in the same manner and with the same level of importance as other forms of communication.
For all communications, I will be prioritising urgent casework for constituents.
Please check that you have included your full name, postal address and phone number in your email. Please note there is a strict convention in the House of Commons that MPs may only act on behalf of their constituents, so if you are not a resident in Warrington North or are unsure who your MP is, you can check at http://findyourMP.parliament.uk
To learn how my office handles personal data, please view my privacy notice at: https://charlottenicholsmp.com/privacy-policy/
Best wishes,
Charlotte Nichols MP
Member of Parliament for Warrington North
House of Commons
London
SW1A 0AA
tel: 020 7219 6677
email: charlotte.nichols.mp@parliament.uk
website: www.charlottenicholsmp.com
twitter: @charlotte2153
facebook: www.facebook.com/CharlotteNichols4WN
UK Parliament Disclaimer: this e-mail is confidential to the intended recipient. If you have received it in error, please notify the sender and delete it from your system. Any unauthorised use, disclosure, or copying is not permitted. This e-mail has been checked for viruses, but no liability is accepted for any damage caused by any virus transmitted by this e-mail. This e-mail address is not secure, is not encrypted and should not be used for sensitive data.
1st May 2026
CH23449
Dear Mr WHITTINGHAM
Thank you for your email in regard to the ongoing problem that your community is experiencing with speeding traffic on Glazebrook Lane Glazebrook, and the subsequent damage being caused, the content of which is acknowledged.
These concerns are fully understood and appreciated, and as there are other correspondences received enquiring as to the feasibility of considering whether average speed cameras may be appropriate for this section of road, your email has now been forwarded to the team who have been dealing with expressions of interest from Parish Councils. This will enable us to provide more information on the funding options for average speed cameras, subject to criteria. As soon as I receive a response back from them in relation to this particular case I will recontact you with an update.
I trust that this is helpful for you and thank you for taking the time to raise this important road safety issue with us.
Yours sincerely
Bryan KENNEDY | Governance and Casework Officer | Office of the Police & Crime Commissioner
Telephone: 01606 364004
8th May 2026
CH23449
Dear Mr WHITTINGHAM
We refer to our previous communication with you on this matter.
As indicated, your concerns were forwarded on to gain an insight into the options available to mitigate these issues in your community and we have now been able to gain a response from the local policing unit Commander for Warrington, Robert McLOUGHLIN, as there is already an average speed camera deployed on a section of Glazebrook Lane, Warrington.
His response is contained below in bold italics:
Thank you for raising residents’ concerns regarding Glazebrook Lane.
Your enquiry has been referred to Chief Inspector Rob McLoughlin, who oversees neighbourhood policing in Warrington.
Following consultation with the Constabulary’s Traffic Management Unit, the assessment is as follows:
The primary concern is vehicles travelling too quickly when approaching the bend, rather than a consistent, route-wide speeding issue. Previous enforcement has been carried out but has been limited in duration and not always optimally positioned.
The agreed approach is to implement more targeted, longer-duration TruCAM enforcement at the bridge near Station Cottages, where it will have the greatest impact on speeds before the bend. Activity will also be varied across peak periods to maximise visibility and deterrence.
From an engineering perspective, options are limited due to the road’s layout and residential setting. Chevrons are not considered suitable, and average speed cameras are not recommended at this stage. However, a potential additional “right bend ahead” warning sign will be referred to Warrington Borough Council Highways for consideration.
Overall, the Constabulary focus will remain on targeted enforcement and education rather than further engineering measures.
Chief Inspector McLoughlin has also shared your contact details with Roads Policing teams and Sgt Ryan Cunliffe, the local Beat Sergeant, to support increased visibility and consideration of wider education and enforcement activity in the area.
Please encourage the Cllr to come direct to Sgt Cunliffe or myself with any wider concerns. Ryan.Cunliffe@cheshire.police.uk
My Response to the above
9th May 2026
CH23449
Dear Mr Kennedy,
Thank you for your message and the efforts that you have made to date on our behalf.
However I would be grateful if the issue could be revisited with some urgency in light of the information below and the attachments that I have included. I would also be grateful for a further response from Chief Inspector Rob McLoughin.
In your response I note from your email the claim that 'there is already an average speed camera deployed on a section of Glazebrook Lane, Warrington.' Please could you specify exactly where on Glazebrook lane this is as there is no evidence whatsoever of its existence or signage to indicate any such enforcement on Glazebrook Lane or its extension towards Culcheth of Holcroft Lane. I can only assume that you have been either misled or your advisers are not aware of the difference between Glazebrook and Glazebury where average speed cameras are very much in evidence.
Further to my initial email to the police crime commissioner, which I appreciate only reflects our direct and personal experience of crashes and collisions outside and in to our property, I decided to ask for a complete list of police attended incidents on Glazebrook Lane as a whole from Cheshire police under the freedom of information act and similarly from Warrington Borough Council including all correspondence from residents in the last 10 years in relation to Speeding, which I currently await.
We also decided to conduct a survey of all residential properties on Glazebrook lane and their experiences of speeding traffic (please see attached), once it became public knowledge that we were undertaking this we were inundated from other residents of Glazebrook (Carlton Way, Bank Street and Vetch Close) to allow them to be involved, to date we have over 250 responses* demanding that action should be taken. (* for convenience and ease of emailing I've compressed them into one pdf file of 252 A5 sized responses).
You may be interested to note the depth of feeling this has elicited from the residents and I would be grateful if you would take the time to read all the comments on the attached documents. Rather sadly we have gained some consolation from discovering that we are not the only property to be blighted by speeding and out of control cars, there appear to be multiple instances along the entire length of Glazebrook lane that are subject to the same problem.
There is a general recognition that whilst many cars drive at an acceptable speed there are a large number who disregard the speed limit entirely and increasingly drive at high speed (45-50 mph plus), undertake dangerous overtaking manoeuvres in a residential area with an increasing degree of aggressive and abusive behaviour.
The fundamental messages from the survey are:
Speeding on Glazebrook Lane is a real problem
There is no effective deterrent
Residents DO NOT FEEL SAFE
The adoption of the 'we'll wait until there is a serious causality or fatality' attitude is completely unacceptable
Please see the table below which represents only the properties on Glazebrook Lane whilst the attached comments and survey is more representative of people living and using the area. I'm sure you'll agree that these figures whilst representing a small community on the edge of Warrington, deserve something better than patronising platitudes and inaction.
I would also like you to note the number of comments relating to the fact that, although it wasn't mentioned on our survey, the residents feel very strongly about the total disregard that is exhibited to the 7.5 tonne weight limit for wagons and apparent lack of enforcement to these violations.
As we have undertaken to keep the respondents informed as to the progress of this issue I'm keen to know what reassurances you would wish us to convey to them.
Yours sincerely
Anthony V. Whittingham
20th May 2026
Dear Mr WHITTINGHAM
We refer to our previous correspondence with you on this matter.
Following your request for CI MCLOUGHLIN to revisit the issues raised any you , quite correctly pointing out that there was no average speed cameras on Glazebrook Lane but rather Glazebury Lane, has been acknowledged by the source of the incorrectly asserted information. An apology is extended to you for this misunderstanding.
Turning to CI McLOUGHLIN’s further response, he advises that for reassurance, local and Roads and Crime Unit teams are already increasing deployments in the area, including a request for TruCam and wider enforcement. He acknowledges that whilst this won’t fully resolve the issue, he is to raise it again with Traffic Management regarding speed van deployments, albeit these are not a constant presence. Additionally, he will ensure the local team and Beat Inspector are sighted on concerns, with a focus on engaging the Parish Council and clearly communicating enforcement activity.
In regard to the latest position on average speed cameras, which may also be able to be considered as an option on this road, if appropriate. In this option, individual applications through Parish Councils can be considered, although average speed is a very expensive solution and is not suitable for all stretches of road. In fact, in some instances cheaper solutions may be more effective, such as engineering or enforcement, which CI McLOUGHLIN referred to in his earlier email. Any solution would require the support of the Local Authority for any scheme to be viable.
We trust that this is a helpful update for you and thank you for contacting the Office of the Police and Crime Commissioner.
Yours sincerely
Bryan KENNEDY
Good afternoon,
The Traffic Management and Road Safety Team operates a strictly data-led approach to Traffic Calming and Safety Engineering interventions. Our primary objective is to allocate limited engineering resources and public funding to locations where the greatest safety benefits can be realised—specifically at sites with a recorded history of speeding-related injury collisions.
All potential sites undergo periodic review against established safety criteria. Where data indicates a site does not meet the necessary threshold for intervention (e.g., a lack of speeding-related injury collisions), the assessment is concluded.
In light of long-standing workload pressures, the department has made a strategic decision to focus professional engineering time on the design and delivery of schemes that meet the criteria and have secured funding. Consequently, formal written documentation is not produced for sites that fail to meet the intervention threshold. This process ensures that "critical path" engineering hours are not diverted toward administrative reporting for non-qualifying sites but are instead dedicated to the delivery of safety improvements at high-priority locations.
We remain committed to monitoring collision data across the network. Should the data profile of a site change, it will be reassessed and prioritised in accordance with our safety-first delivery model.
Previous interventions do include the addition of the police enforcement repeater and terminal signage throughout the route and provision of Vehicle Interactive Signage. Where it is appreciated from the reports received of inappropriate speed causing higher concerns for damage only incidents that are not recorded by the police traffic speed, volume and vehicle type assessments have been ordered and will be set in place over 5 locations along Glazebrook Lane and officers will assess these results to appreciate any further potential measures that could be considered along the route.
Attached is a 10-year breakdown of injury collisions occurring on Glazebrook Lane, please note 2026 has only 2 months of search output due to this being the latest available data set provisioned by Cheshire Police over 1.8miles of carriageway between the motorway overbridge and the A57 Manchester Road junction.
Also attached is a document which shows the requests, complaints or enquiries received by the Council relating to traffic calming measures on Glazebrook Lane. We only hold information from July 2020 on our system regarding the enquiries.
Regards
FOI Administrator
Warrington Borough Council
Warrington Borough Council, 1 Times Square, Warrington
FILE LINKS: Glazebrook Lane - Yearly Trend
YOUR REQUEST:
Please provide data on recorded road traffic accidents on Glazebrook Lane, Warrington, covering the period from 1 January 2016 to 15 April 2026.
If possible, I would like the information to include:
1) The total number of road traffic accidents recorded
2) A breakdown by year
3) Severity classification (fatal, serious, slight, if available)
4) The date of each incident (or month/year if exact dates cannot be disclosed)
5) Any available information on contributing factors (e.g. speeding, weather conditions), if held
OUR RESPONSE:
In accordance with section 1(1) (b) of the Act, our response is as follows:
Date period; 01/01/2018 - 20/03/26 (30 days before last date available as collision severity can be changed up to 30 days after collision),
Dear Councillors and Chief Inspector McLoughlin,
Hopefully you'll be aware of the concerns of the residents of Glazebrook with regard to the ongoing problem of speeding vehicles on Glazebrook Lane and further to my previous correspondence I hope you find this further information of interest and I would welcome your thoughts and comments on the points made below.
I would be grateful if the following could be forwarded to any relevant persons or departments that have an interest of may have contribute to any replies on this matter notably the traffic management and road safety team.
Firstly, thank you for the information provided as a result of the FoI request.
I note that in the period requested in the FoI:
There have been 18 requests for something to be done in relation to traffic calming measures since 2020
13 police attended/reported collisions
14 casualties of varying severity
In response to the points above:
I attach a file containing 235 individual requests for urgent action to be taken to address the problem of speeding vehicles on the section of Glazebrook Lane under discussion (A57 to M62 motorway bridge). Many respondents have taken the time to write comments and experiences and consequently i would be grateful if you would read through and note their concerns.
I’d be grateful if you’d refer to the table below for the breakdown of respondents*
The overriding sentiments from the attached respondents are:
Excessive speeding is a source of real concern for residents.
Residents do not feel safe entering and exiting their driveways and homes.
Respondents do not feel safe walking on what pavements there are.
Residents are often intimidated by aggressive and abusive drivers when they are driving within the 30mph speed limit.
Many residents have direct experiences of damage to their cars and property often not reported to the police and occasionally without the transgressing vehicle even stopping.
I’m not sure how many accidents serious injury, fatal or otherwise a 1.5 mile of road is expected to support but the 14 listed seems high for any stretch let alone a residential area with some properties fronting directly on to the road, a church that houses a pre-school nursery, very narrow badly cambered pavements and some stretches where no pavement exists at all.
It’s the last point along with the following statements from the response dated 15th April 2026 that causes us, the residents of Glazebrook, most concern.
‘The Traffic Management and Road Safety Team operates a strictly data-led approach to Traffic Calming and Safety Engineering interventions. Our primary objective is to allocate limited engineering resources and public funding to locations where the greatest safety benefits can be realised—specifically at sites with a recorded history of speeding-related injury collisions.
All potential sites undergo periodic review against established safety criteria. Where data indicates a site does not meet the necessary threshold for intervention (e.g., a lack of speeding-related injury collisions), the assessment is concluded.’
How many deaths or serious and life changing injuries are we expected to endure and accept as reasonable before something gets done? Surely the valid concerns of over 70% of the total residents in a directly affected zone along with a substantial proportion of residents on the side streets alerting the authorities to the substantial threat and danger that residents justly regard as a blight on their everyday lives should be addressed.
On researching the core focusses of WBC I found the claim that ‘what matters most are three core focuses, our People, our Place, and the quality of our Public Services’. There is an opportunity for this to be demonstrated by acknowledging and actively responding to the needs of a beleaguered part of the Warrington community.
On a lighter note I was interested to note that the official motto for Warrington borough Council is “Deus Dat Incrementum” translated as ‘God giveth increase’ , I feel that it can be radically improved upon and offer the following: ‘Deus dat incrementum camerarum celeritatis mediae in Via Glazebrook’.
Yours sincerely
Anthony V. Whittingham
Good morning, Mr Whittingham,
We’ve had some prior contact via the PCC’s Office, but by way of formal introduction, I’m Chief Inspector Rob McLoughlin, responsible for local neighbourhood policing across Warrington.
I’m aware of the below and earlier correspondence and have shared this with colleagues in Traffic Management. You will also be aware of my expectation for increased community policing engagement and deployments in the area.
Given your concerns, a broader response from Cllrs / Warrington Borough Council will no doubt follow. Internally, I will arrange a meeting with the relevant neighbourhood policing team and the Constabulary’s Traffic Management Unit to discuss in more detail.
Due to leave and other commitments, this is likely to take place in early June. I will update you following these discussions.
Regards
Rob McLoughlin - Chief Inspector – Warrington LPU Commander
Northern Area Response Policing Lead / Force SOAC & Robbery Thematic Lead
Hi Tony
Thanks for this detailed information. I'll endeavour to make sure it is directed to the right people who are able to make the safe and correct decisions.
Kind regards
Rob
28th May 2026
Thank you for your inquiry regarding the ongoing road safety and speeding concerns on Glazebrook Lane. I am writing to provide you with an update on the actions currently underway, our timeline for data collection, and potential future options.
Whilst undertaking the review of the freedom of information request the collision assessment identified the need to look at this location further as a result of which we commissioned five targeted speed surveys through our designated external survey team. These strategic locations along Glazebrook Lane will provide us with a complete understanding of overall route flows, vehicle types, and speeds.
The reason historically action was not undertaken is due to the individual request parameters from residents and national standard search protocols.
Low Collision Average: While 14 casualties were noted within the FOI these were recoded over a ten-year period, meaning an averages 1.3 collisions per year across the entire 1.5-mile route. Over the nationally recognised standard criteria being three-year search windows, fewer than four collisions were recorded over the whole route. This is considered a low average relative to substantial numbers of higher-risk areas within the Borough.
Lack of Clusters: The Freedom of Information (FOI) requests identified concerns along the whole 1.5m route. When analysing the precise sections of the road that were requested within the majority of the 18 correspondence received over the required three-year window, the number of recorded incidents drops significantly, with some specific locations returning zero injury collisions. These results restricted the ability to prioritise any works from being undertaken through the Local Safety Scheme Program.
Causation Factors: The collisions that did occur were sporadic and primarily linked to junction turning issues and driver perception errors, rather than speeding.
Road safety engineering measures (such as physical traffic calming) are designed to adjust road layouts that contribute to collision occurrences. They cannot practically address or prevent individual driver errors or misjudgements at junctions or distractions and errors along the route that are not speeding related.
Furthermore, local authorities only receive data from the police regarding collisions that result in personal injury. We do not receive or hold records for damage-only incidents, meaning minor vehicular collisions cannot legally be factored into our safety scheme assessments.
We have been instructed that the survey equipment was installed on 15th May and is scheduled for retrieval on 26th May. We anticipate receiving the finalised data toward the end of the first week in June.
We are working closely with Cheshire Police to try to support these community concerns. The police are scheduled to meet in early June to specifically discuss speeding issues along this route and to proactively support them, we have officially offered to fund and install dedicated hard-standing areas to accommodate mobile speed camera vans, provided the police identify viable and safe deployment locations on Glazebrook Lane.
Once the ATC data is returned, our next steps will depend heavily on the recorded 85th percentile speeds:
If Speeds Exceed Enforcement Thresholds: The ideal long-term solution for this route could be the installation of average speed cameras. However, please be aware that the necessary funding model is not yet active, as the wider partnership Service Level Agreement (SLA) is currently still in the drafting stage and the criteria for all safety camera installations to be agreed following the removal of the central camera partnership model and controls set by the Department for Transport.
If Speeds Fall Below Enforcement Thresholds: Should the data show that speeds do not legally warrant intervention, our remaining options will be highly limited. Securing priority funding will be difficult, and we remain heavily resistant to traditional physical engineering measures (such as speed humps), as previous installations have generated substantial resident complaints regarding noise and airborne vibrations.
We intend to thoroughly assess the survey data upon receipt and immediately use it to liaise with the police regarding their deployment strategy and then look to understand what further options may be open to us whilst following the progression of the Camera Partnership SLA status and camera deployment strategies also currently being redrawn for potential future support.
Kind regards
Jamie Fisher
Interim Traffic Management, Road Safety & Highway Adoptions Manager
Transport for Warrington
Phone – 01925 442938
Transport for Warrington
Place Directorate
Warrington Borough Council
Post to – East Annex, Town Hall, Sankey Street, Warrington, WA1 1UH
Office Base - One Time Square, WA1 3NT
6th June 2026
Mr Whittingham,
By way of update, I’ve met with colleagues from the Constabulary’s Traffic Management Unit and Warrington East Beat Team, who hold responsibility for local policing in your area.
Assessments are ongoing, in conjunction with Warrington Borough Council Highways, to identify suitable locations for static camera van deployment along the affected route. This work involves reviewing road layout, safety considerations, visibility, and enforcement criteria. While decisions around road design and traffic calming sit across multiple agencies, there are encouraging indications that this may support a more tailored and sustainable enforcement approach locally.
In the shorter term, I recognise that handheld TruCAM activity has been somewhat sporadic. Plans are now in place to increase this, and I expect to see more frequent and overt enforcement in the area. I have also asked teams to better communicate activity undertaken - both via social media and more formal updates - to improve transparency and community confidence.
Whilst operational capacity and competing demand remain factors, your concerns are fully noted. I have tasked the relevant supervisor to ensure activity is prioritised and progressed. As you are aware, enforcement options develop incrementally - from handheld activity through to camera van deployment and, where appropriate, longer-term measures - and are supported by recorded data and community reporting. Continued reporting will therefore remain important in helping us direct resources and strengthen our ongoing discussions with partner agencies.
I hope this provides reassurance around both the immediate steps being taken and the broader work underway to address your concerns.
I have copied in my colleague Inspector Chris Webster who has responsibility for your local area. Please keep us sighted on concerns / updates - but I am hopeful that you will see increased visibility in response.
Regards
Rob McLoughlin - Chief Inspector – Warrington LPU Commander
6.50 AM this morning there was yet another crash/incident outside 144 Glazebrook Lane with a motorcyclist travelling towards Culcheth.
Fortunately he was only concussed, cut, bruised and shocked after a short spell was able to continue (he was adamant that he wasn't hanging around for an ambulance {which was initially called but then cancelled when he said he wouldn't wait} or police!).
However, once he was able to speak sensibly, his first words were 'I took the corner too fast', he repeated this several times, said he was fine, which is more than his bike and helmet were (smashed fairings,lights etc, cracked and scuffed helmet).
Most fortunately for him he did not slide into the oncoming traffic but hit a concrete garden wall instead, I say fortunately for as had it had gone the other way I think that we'd be looking at our first fatality.
It's not the bend, it's the speed!
Yours with increasing frustration at the lack of obvious progress
Anthony V. Whittingham
Many thanks for your comprehensive response and explanation of highways reasoning behind traffic calming and control in relation to Glazebrook Lane.
However, I feel that I must respond to some of your assertions around the nature and cause for single vehicle accidents and collisions on Glazebrook Lane, particularly the ones that affect me directly. Having had to replace sections of my hedge 5 times, 2 telephone poles having been smashed and replaced, our concrete embedded gate and posts being smashed and needing to be replaced along with a WBC road sign not to mention my neighbours car having been written off (whilst on the drive and well off the road), a collision with a static vehicle (the perpetrator just driving off without stopping) and just last week a motor cyclist losing control and hitting a concrete garden wall, I can assure you that these incidents were in no way connected to your bulleted point stating:
'Causation Factors: The collisions that did occur were sporadic and primarily linked to junction turning issues and driver perception errors, rather than speeding.'
I can also assure you that there is no shortage of evidence in lack of cluster as I refer to accidents specifically in the 100 yard stretch between Glazebrook station and Dam head lane, all incidents involve a single vehicle travelling well in excess of the 30 mph limit regardless of what they tell the attending police officer or their insurance company.
Whilst I understand that current practice is for all responses and consequent accountability to be data driven I feel that relying on 2nd hand data provided externally and ignoring the first hand evidence of witnesses and the testimony of over 200 signatories to an issue of immense local concern I must respectfully regard as limited in breadth of evidence and efficacy.
I feel that most residents of Glazebrook will freely admit that the vast majority of vehicles travelling on Glazebrook lane are moving within acceptable parameters of the speed limit, the problem we are experiencing is the increasing number of drivers who feel that the speed limits don't apply to them and consistently drive at speeds well in excess of the speed limit as evidenced by damage caused, these occur predominantly during early morning, evenings and weekends and it is these 'rogue' elements that remain undeterred by occasional cameras and police activity which I have only ever seen during the daytime working hours.
In conclusion I would like to take this opportunity to offer my thanks for all your efforts to find an acceptable solution to what I know is the difficult conundrum of managing expectations against budget restraints but hope something can be achieved that will result in a safer environment for the residents of Glazebrook.
Kind regards
Tony Whittingham
Response from Charlotte Nichols MP (Caseworker - Rebecca Knowles) Including reply from Warrington Chief Executive
Dear Tony,
I am pleased to confirm that today I have received the following response from the Interim Traffic Management, Road Safety & Highway Adoptions Manager at Warrington Borough Council:
I am responding on behalf of our Chief Executive Sarah Smith in relation to the ongoing concerns raised in relation to Glazebrook Lane.
The council fully understands the issues impacting this route, and we have been actively working to identify appropriate, data-driven solutions.
We have already undertaken comprehensive speed surveys and liaised directly with the police regarding enforcement options. As a result of this collaboration, we have agreed upon two potential locations for a mobile camera speed van. Our teams are currently checking land ownership and engineering provision capability at these specific sites to ensure enforcement operations can be safely and legally conducted.
Our engineers have just received the raw data from the recent speed surveys and will now begin reviewing possible physical highways options. However, it is important to manage expectations regarding physical engineering measures. Vertical or horizontal deflections (such as speed humps or chicanes) generally introduce increased noise and vibration pollution for nearby properties due to braking, acceleration, idling engines, and heavy vehicles impacting the features. This disruption must be fully understood and accepted by the local community if residents are to agree to such provisions. If such a proposal were to be identified a full consultation including all properties along the affected route will be undertaken explaining the negatives as well as the positives for the possible provisions.
The council will be severely stretched to undertake a substantial engineering adjustment to the route so it is imperative that the delivery deals with all of the concerns raised and the outcomes are palatable for all living along the route as we would not have sufficient resource to remove or adjust measures if installed due to residents frustrations relating to the noise and vibration created.
Please note that the criteria for a fixed static speed camera are not met on Glazebrook Lane. The recorded injury collision data for this location does not identify speeding as a causation factor, meaning it fails to meet the strict intervention thresholds required for permanent camera installations by the Camera Partnership. The council cannot progress independent enforcement camera provisions as these are run by the police through the aforementioned partnership.
We will keep stakeholders updated as the engineering review and the mobile enforcement site checks are finalised as these do not need to follow the camera partnership criteria being solely delivered by the Police.
It is hoped that the above information is of assistance and identifies our support and commitment to assist where possible with this issue.
I have emphasised the key elements in bold and will be sharing this response with Glazebrook Parish Council, who have also been in touch with Charlotte Nichols MP with shared concerns. I hope that you feel that some action is now going to be taken, although in terms of fixed traffic calming measures, these would require consensus between the residents, following a consultation.
Kind regards,
Rebecca Knowles
Caseworker for Charlotte Nichols MP
Warrington North